Figure 44. After overnight showers a rain-slicked floor made the work challenging. 9-11-2015.
Figure 62. The crew. Ali Aqil, standing far right, was the group’s foreman whose work strategy enabled the completion of the reservoir reconditioning in four weeks. Photo by visitor, 7-11-2015.
Figure 21. Smaller stones were carried up the steps in a grand 15 minute ‘parade’ in which the 20 members of the Commodus Gate Preservation team participated. 21-10-2015.
Figure 49. Soil is gone! 14-11-2015. Photo by Muaffaq Hazza.
Figure 4. 3 November, 2015, 110 years later, and 60 years after re plastering of the masonry and bedrock. The bosses of the draughted masonry remain visible as bumps in the thick layer of cement, but the “coping” has been removed. 3-11-2015.
Figure 41. Another way was to dam up the puddles and move the water away sideways. 8-11-2015.
Figure 46. Left to be done in in the last 4 days, 10-13 November. 9-11-2015.