Figure 62. The crew. Ali Aqil, standing far right, was the group’s foreman whose work strategy enabled the completion of the reservoir reconditioning in four weeks. Photo by visitor, 7-11-2015.
Figure 20. Stone removal part 4; this completed the clearing of sediment basin 2, 19-10-2015.
Figure 6. Water drawing station built in the 1955 preservation. The stones on the right and the left used to protrude to provide standing space for a person drawing water with a bucket on a rope. They were broken off by vandals. 3-11-2015.
Figure 14. The last frog standing, 21-10-2015.
Figure 38. Stratified sediment, 50 cm deep. 5-11-2015.
Figure 37. Arriving at the deep center. 5-11-2015.
Figure 58. Removing sediment mound from this and earlier cleanouts south side of reservoir. 7-11-2015.