Figure 5. Dedication of USAID funded re-plastering of the reservoir: “Inception of the repair of this reservoir was on 22 December 1954; and completion was on 28 February, 1955. The writer of the line of text was Rakan Ibn Awdah es-Serour.” 10-21-2015.
Figure 52. Mayor Hasan Fahed Rgaibeh starting power wash. 14-11-2015.
Figure 60. Sediment from reservoir supplies municipal street side landscaping soil. 8-11-2015
Figure 15. Nearly a truckload of accumulated trash and garbage was collected before removal of stones and soil began. 19-10-2015.
Figure 27. Stone up 5- over the edge! 24-10-2015.
Figure 41. Another way was to dam up the puddles and move the water away sideways. 8-11-2015.
Figure 22. Stone and soil removal – experimental; it proved very difficult to flip the stones over the top edge. 22-10-2015.
Figure 30. Taking the high ground first – in a sea of wet sediment. 27-10-2015