Figure 61. The north wall of Houses 87 (right) & 88 (left) exposed after the removal of the long-term reservoir cleanout mound from its south side. 10-11-2015. Photo by Muaffaq Hazza.
Figure 62. The crew. Ali Aqil, standing far right, was the group’s foreman whose work strategy enabled the completion of the reservoir reconditioning in four weeks. Photo by visitor, 7-11-2015.
Figure 26. Stone up 4. 24-10-2015.
Figure 9. Supply Channel, NW corner of Umm el-Jimal, 1-2-2012
Figure 63. Contribution of the Municipality. Mayor Hassan Fahed (right) and Muaffaq Hazza. 7-11-2015
Figure 19. Stone removal part 3. 19-10-2015
Figure 12. A huge quantity of stone was thrown into the reservoir in the past 20 years. Foreman Ali Aqil serves as scale, 19-9-2015.
Figure 47. Three days later, the last pocket of soil on the last day of scheduled team work. Photo by Muaffaq Hazza. 13-11-2015