Figure 42. Sunshine and evaporation proved the best drying agent! 8-11-2015
Figure 21. Smaller stones were carried up the steps in a grand 15 minute ‘parade’ in which the 20 members of the Commodus Gate Preservation team participated. 21-10-2015.
Figure 64. Payday in the rain shelter of the House XIII great room. Ali Aqil and Bert de Vries distributing the weekly payroll, 5-11-2015. Photo by Muaffaq Hazza
Figure 22. Stone and soil removal – experimental; it proved very difficult to flip the stones over the top edge. 22-10-2015.
Figure 37. Arriving at the deep center. 5-11-2015.
Figure 60. Sediment from reservoir supplies municipal street side landscaping soil. 8-11-2015
Figure 35. Attacking the middle 2: four hours later, 12:02 pm, 2-11-2015.
Figure 9. Supply Channel, NW corner of Umm el-Jimal, 1-2-2012