Figure 49. Soil is gone! 14-11-2015. Photo by Muaffaq Hazza.
Figure 9. Supply Channel, NW corner of Umm el-Jimal, 1-2-2012
Figure 15. Nearly a truckload of accumulated trash and garbage was collected before removal of stones and soil began. 19-10-2015.
Figure 57. Cleaned reservoir with clean water after the first rain, 19-11-2015. Photo by Muaffaq Hazza.
Figure 35. Attacking the middle 2: four hours later, 12:02 pm, 2-11-2015.
Figure 62. The crew. Ali Aqil, standing far right, was the group’s foreman whose work strategy enabled the completion of the reservoir reconditioning in four weeks. Photo by visitor, 7-11-2015.
Figure 52. Mayor Hasan Fahed Rgaibeh starting power wash. 14-11-2015.
Figure 44. After overnight showers a rain-slicked floor made the work challenging. 9-11-2015.