Figure 30. Taking the high ground first – in a sea of wet sediment. 27-10-2015
Figure 4. 3 November, 2015, 110 years later, and 60 years after re plastering of the masonry and bedrock. The bosses of the draughted masonry remain visible as bumps in the thick layer of cement, but the “coping” has been removed. 3-11-2015.
Figure 31. The rainfall was light, and the soil dried quickly. 29-10-2015
Figure 56. The following week some rains came. 17-11-2015. Photo by Muaffaq Hazza.
Figure 5. Dedication of USAID funded re-plastering of the reservoir: “Inception of the repair of this reservoir was on 22 December 1954; and completion was on 28 February, 1955. The writer of the line of text was Rakan Ibn Awdah es-Serour.” 10-21-2015.
Figure 65. Mayor Hasan Fahed standing by the erstwhile al-Rgaibeh family reservoir. 9-11-2015. See figure 1, R19.