Figure 9. Supply Channel, NW corner of Umm el-Jimal, 1-2-2012
Figure 17. Sediment basin 2, stone removal, part 1. 19-10-2015
Figure 40. Pumping the puddles; the main challenge is to keep the water away from the soil. Shown here is a small pump provided by Mayor Hassan Fahed and his municipal staff. 7-11-2015.
Figure 36. Each of two teams marked off squares for removal. 4-11-2015
Figure 43. After work, 8-11-2015.
Figure 7. Graffiti over graffiti over the stairs, 19-10-2015
Figure 37. Arriving at the deep center. 5-11-2015.
Figure 61. The north wall of Houses 87 (right) & 88 (left) exposed after the removal of the long-term reservoir cleanout mound from its south side. 10-11-2015. Photo by Muaffaq Hazza.