Figure 33. NE corner 2. Full buckets ‘flew’ up rapidly, and mounds of soil accumulated. 1-11-2015.
Figure 56. The following week some rains came. 17-11-2015. Photo by Muaffaq Hazza.
Figure 25. Stone up 3. 24-10-2015.
Figure 46. Left to be done in in the last 4 days, 10-13 November. 9-11-2015.
Figure 6. Water drawing station built in the 1955 preservation. The stones on the right and the left used to protrude to provide standing space for a person drawing water with a bucket on a rope. They were broken off by vandals. 3-11-2015.
Figure 4. 3 November, 2015, 110 years later, and 60 years after re plastering of the masonry and bedrock. The bosses of the draughted masonry remain visible as bumps in the thick layer of cement, but the “coping” has been removed. 3-11-2015.
Figure 57. Cleaned reservoir with clean water after the first rain, 19-11-2015. Photo by Muaffaq Hazza.
Figure 29. Soil removal – bucket by bucket, after the first rain, 26-10-2014