Figure 5. Dedication of USAID funded re-plastering of the reservoir: “Inception of the repair of this reservoir was on 22 December 1954; and completion was on 28 February, 1955. The writer of the line of text was Rakan Ibn Awdah es-Serour.” 10-21-2015.
Figure 30. Taking the high ground first – in a sea of wet sediment. 27-10-2015
Figure 59. Onto dump small truck. 7-11-2015
Figure 45. Final days: Racing the clock and racing the rain. 9-11-2015
Figure 54. … including the walls. For inscription see Fig. 5. 14-11-2015. Photo by Muaffaq Hazza.
Figure 52. Mayor Hasan Fahed Rgaibeh starting power wash. 14-11-2015.
Figure 10. Roman Reservoir the day after the rains, 2-2-2012.