Figure 40. Pumping the puddles; the main challenge is to keep the water away from the soil. Shown here is a small pump provided by Mayor Hassan Fahed and his municipal staff. 7-11-2015.
Figure 25. Stone up 3. 24-10-2015.
Figure 48. The last bit of sediment disappearing, 10 am, 13-11-2015. The team had chosen to work Friday instead of Saturday, to have their Grand Finale a day early! Photo by Muaffaq Hazza.
Figure 44. After overnight showers a rain-slicked floor made the work challenging. 9-11-2015.
Figure 41. Another way was to dam up the puddles and move the water away sideways. 8-11-2015.
Figure 18. Stone removal part 2. 19-10-2015
Figure 17. Sediment basin 2, stone removal, part 1. 19-10-2015
Figure 54. … including the walls. For inscription see Fig. 5. 14-11-2015. Photo by Muaffaq Hazza.