Figure 9. Supply Channel, NW corner of Umm el-Jimal, 1-2-2012
Figure 24. Stone up 2. 24-10-2015.
Figure 47. Three days later, the last pocket of soil on the last day of scheduled team work. Photo by Muaffaq Hazza. 13-11-2015
Figure 21. Smaller stones were carried up the steps in a grand 15 minute ‘parade’ in which the 20 members of the Commodus Gate Preservation team participated. 21-10-2015.
Figure 35. Attacking the middle 2: four hours later, 12:02 pm, 2-11-2015.
Figure 62. The crew. Ali Aqil, standing far right, was the group’s foreman whose work strategy enabled the completion of the reservoir reconditioning in four weeks. Photo by visitor, 7-11-2015.
Figure 37. Arriving at the deep center. 5-11-2015.
Figure 22. Stone and soil removal – experimental; it proved very difficult to flip the stones over the top edge. 22-10-2015.