Figure 7. Reservoir R31 just after the cleanout began, 11 Oct. 2016.
Figure 4. Reservoir R7 cleaning completed. The Druze-constructed pillars supported the roof. 1 Nov. 2016
Figure 22. Crew members begin cleaning of sediment and algae. 26 October, 2016
Figure 21. The dry south west corner of Reservoir 13 with its deposit of plastic bottles on top of algae ‘rooted’ in about 3 cm of new sediment. 26 October, 2016.
Figure 14. Leveled area looking south-southwest across Reservoir R19. 25 October 2016.
Figure 5. The energetic crew that completed the R7 excavation. 20 Oct 2017.
Figure 18. The undisturbed sediment area in Reservoir R16. 29 October, 2016.
Figure 12. Reservoir with rock and soil heaps; looking north. 11 Oct. 2016.