Figure 9. Reservoir R7 after cleanout, with 20th century plaster intact. 27 October 2016.
Figure 25. Team 2. The Group mostly responsible for clearing the deep stone layer from Quarry-Reservoir R19. 2 November, 2016.
Figure 10. Twentieth Century surface supply channel collected runoff from open field to north of Reservoir R31. Oct 10, 2016.
Figure 7. Reservoir R31 just after the cleanout began, 11 Oct. 2016.
Figure 1. Map of reservoirs in the middle of Byzantine Umm el-Jimal.
Figure 20. Reservoir 13 with water remaining to an average depth of one meter. In the foreground one can see the shelf of exposed bedrock floor and the algae bloom in the shallower water. 26 October 2016.
Figure 16. Reservoir R19 at end of season; final cleanup to be done in 2017. 2 November 2016.
Figure 13. Removal of twentieth century reservoir cleanout. 12 Oct. 2016.