Figure 13. Removal of twentieth century reservoir cleanout. 12 Oct. 2016.
Figure 24. Team 1. The group that worked the first two weeks and is mostly responsible for the clearing and cleaning of reservoirs R7 and R31.
Figure 17. Close up view of quarry marks. Below the 10-cm scale stick the groove in which wood wedges soaked with water were jammed is clearly visible. Because of the fine-grained igneous texture, the basalt blocks split of smoothly, similar to a flint sliver knapped from a core. 1 November, 2016.
Figure 8. Crew removing building blocks from Reservoir R31. 20 October 2016.
Figure 15. In the final week, a new crew began the clearing of stones from the Reservoir R19 itself. 1 Nov. 2016.
Figure 2. Reservoir R7 in courtyard of House 52 before work began. 10 Oct 2016.
Figure 10. Twentieth Century surface supply channel collected runoff from open field to north of Reservoir R31. Oct 10, 2016.
Figure 18. The undisturbed sediment area in Reservoir R16. 29 October, 2016.