Figure 22. Stone and soil removal – experimental; it proved very difficult to flip the stones over the top edge. 22-10-2015.
Figure 11. Reservoir with residue of rain-supplied water from the winter of 2014-5, 19-9-2015.
Figure 46. Left to be done in in the last 4 days, 10-13 November. 9-11-2015.
Figure 60. Sediment from reservoir supplies municipal street side landscaping soil. 8-11-2015
Figure 48. The last bit of sediment disappearing, 10 am, 13-11-2015. The team had chosen to work Friday instead of Saturday, to have their Grand Finale a day early! Photo by Muaffaq Hazza.
Figure 8. Wadi Za’atari in Umm el-Jimal, 1-2-2012.
Figure 17. Sediment basin 2, stone removal, part 1. 19-10-2015
Figure 42. Sunshine and evaporation proved the best drying agent! 8-11-2015