Figure 7. Graffiti over graffiti over the stairs, 19-10-2015
Figure 33. NE corner 2. Full buckets ‘flew’ up rapidly, and mounds of soil accumulated. 1-11-2015.
Figure 16. Removing stones from sediment basin 1, 19-10-2015.
Figure 61. The north wall of Houses 87 (right) & 88 (left) exposed after the removal of the long-term reservoir cleanout mound from its south side. 10-11-2015. Photo by Muaffaq Hazza.
Figure 18. Stone removal part 2. 19-10-2015
Figure 60. Sediment from reservoir supplies municipal street side landscaping soil. 8-11-2015
Figure 45. Final days: Racing the clock and racing the rain. 9-11-2015