Figure 49. Soil is gone! 14-11-2015. Photo by Muaffaq Hazza.
Figure 42. Sunshine and evaporation proved the best drying agent! 8-11-2015
Figure 14. The last frog standing, 21-10-2015.
Figure 4. 3 November, 2015, 110 years later, and 60 years after re plastering of the masonry and bedrock. The bosses of the draughted masonry remain visible as bumps in the thick layer of cement, but the “coping” has been removed. 3-11-2015.
Figure 31. The rainfall was light, and the soil dried quickly. 29-10-2015
Figure 23 Stone up 1. 24-10-2015.
Figure 17. Sediment basin 2, stone removal, part 1. 19-10-2015