Figure 15. Nearly a truckload of accumulated trash and garbage was collected before removal of stones and soil began. 19-10-2015.
Figure 32. NE corner 1. 1-11-2015
Figure 38. Stratified sediment, 50 cm deep. 5-11-2015.
Figure 40. Pumping the puddles; the main challenge is to keep the water away from the soil. Shown here is a small pump provided by Mayor Hassan Fahed and his municipal staff. 7-11-2015.
Figure 27. Stone up 5- over the edge! 24-10-2015.
Figure 46. Left to be done in in the last 4 days, 10-13 November. 9-11-2015.
Figure 30. Taking the high ground first – in a sea of wet sediment. 27-10-2015