Figure 47. Three days later, the last pocket of soil on the last day of scheduled team work. Photo by Muaffaq Hazza. 13-11-2015
Figure 14. The last frog standing, 21-10-2015.
Figure 46. Left to be done in in the last 4 days, 10-13 November. 9-11-2015.
Figure 41. Another way was to dam up the puddles and move the water away sideways. 8-11-2015.
Figure 36. Each of two teams marked off squares for removal. 4-11-2015
Figure 7. Graffiti over graffiti over the stairs, 19-10-2015
Figure 11. Reservoir with residue of rain-supplied water from the winter of 2014-5, 19-9-2015.
Figure 62. The crew. Ali Aqil, standing far right, was the group’s foreman whose work strategy enabled the completion of the reservoir reconditioning in four weeks. Photo by visitor, 7-11-2015.