Figure 4. 3 November, 2015, 110 years later, and 60 years after re plastering of the masonry and bedrock. The bosses of the draughted masonry remain visible as bumps in the thick layer of cement, but the “coping” has been removed. 3-11-2015.
Figure 9. Supply Channel, NW corner of Umm el-Jimal, 1-2-2012
Figure 45. Final days: Racing the clock and racing the rain. 9-11-2015
Figure 54. … including the walls. For inscription see Fig. 5. 14-11-2015. Photo by Muaffaq Hazza.
Figure 22. Stone and soil removal – experimental; it proved very difficult to flip the stones over the top edge. 22-10-2015.
Figure 8. Wadi Za’atari in Umm el-Jimal, 1-2-2012.
Figure 31. The rainfall was light, and the soil dried quickly. 29-10-2015
Figure 46. Left to be done in in the last 4 days, 10-13 November. 9-11-2015.