Figure 64. Payday in the rain shelter of the House XIII great room. Ali Aqil and Bert de Vries distributing the weekly payroll, 5-11-2015. Photo by Muaffaq Hazza
Figure 20. Stone removal part 4; this completed the clearing of sediment basin 2, 19-10-2015.
Figure 30. Taking the high ground first – in a sea of wet sediment. 27-10-2015
Figure 8. Wadi Za’atari in Umm el-Jimal, 1-2-2012.
Figure 4. 3 November, 2015, 110 years later, and 60 years after re plastering of the masonry and bedrock. The bosses of the draughted masonry remain visible as bumps in the thick layer of cement, but the “coping” has been removed. 3-11-2015.
Figure 40. Pumping the puddles; the main challenge is to keep the water away from the soil. Shown here is a small pump provided by Mayor Hassan Fahed and his municipal staff. 7-11-2015.
Figure 43. After work, 8-11-2015.
Figure 45. Final days: Racing the clock and racing the rain. 9-11-2015