Figure 15. In the final week, a new crew began the clearing of stones from the Reservoir R19 itself. 1 Nov. 2016.
Figure 5. The energetic crew that completed the R7 excavation. 20 Oct 2017.
Figure 19. Refilling the bulldozer gauges on the west edge of Reservoir R16. 29 October, 2016.
Figure 11. Reservoir R19 with soil heaps; looking to southwest. 11 Oct 2016.
Figure 22. Crew members begin cleaning of sediment and algae. 26 October, 2016
Figure 18. The undisturbed sediment area in Reservoir R16. 29 October, 2016.
Figure 8. Crew removing building blocks from Reservoir R31. 20 October 2016.
Figure 21. The dry south west corner of Reservoir 13 with its deposit of plastic bottles on top of algae ‘rooted’ in about 3 cm of new sediment. 26 October, 2016.