Figure 2. Reservoir R7 in courtyard of House 52 before work began. 10 Oct 2016.
Figure 20. Reservoir 13 with water remaining to an average depth of one meter. In the foreground one can see the shelf of exposed bedrock floor and the algae bloom in the shallower water. 26 October 2016.
Figure 16. Reservoir R19 at end of season; final cleanup to be done in 2017. 2 November 2016.
Figure 19. Refilling the bulldozer gauges on the west edge of Reservoir R16. 29 October, 2016.
Figure 23. The cleaned portion of exposed floor. Proper care of this water source will require periodic cleaning of the entire reservoir floor, at times when the entire water supply is used up. 27 October, 2016.
Figure 3. Excavation of the rubble approaching completion. 25 October 2016.
Figure 22. Crew members begin cleaning of sediment and algae. 26 October, 2016
Figure 5. The energetic crew that completed the R7 excavation. 20 Oct 2017.