Figure 48. The last bit of sediment disappearing, 10 am, 13-11-2015. The team had chosen to work Friday instead of Saturday, to have their Grand Finale a day early! Photo by Muaffaq Hazza.
Figure 19. Stone removal part 3. 19-10-2015
Figure 62. The crew. Ali Aqil, standing far right, was the group’s foreman whose work strategy enabled the completion of the reservoir reconditioning in four weeks. Photo by visitor, 7-11-2015.
Figure 45. Final days: Racing the clock and racing the rain. 9-11-2015
Figure 15. Nearly a truckload of accumulated trash and garbage was collected before removal of stones and soil began. 19-10-2015.
Figure 36. Each of two teams marked off squares for removal. 4-11-2015
Figure 7. Graffiti over graffiti over the stairs, 19-10-2015