Figure 49. Soil is gone! 14-11-2015. Photo by Muaffaq Hazza.
Figure 8. Wadi Za’atari in Umm el-Jimal, 1-2-2012.
Figure 46. Left to be done in in the last 4 days, 10-13 November. 9-11-2015.
Figure 26. Stone up 4. 24-10-2015.
Figure 28. While stones were being removed, another part of the team began removing the soil using buckets and ropes. The strategy was to remove the thinner layers from the edges where bedrock was higher to isolate the deeper and thicker layer in the middle. This and the following 20 photographs show the soil ‘melt’ away until the final remnant is removed from the deeper center. 20-10-2015
Figure 5. Dedication of USAID funded re-plastering of the reservoir: “Inception of the repair of this reservoir was on 22 December 1954; and completion was on 28 February, 1955. The writer of the line of text was Rakan Ibn Awdah es-Serour.” 10-21-2015.
Figure 29. Soil removal – bucket by bucket, after the first rain, 26-10-2014
Figure 50.Ali Aqil sweeping up, 13-11-2015. Photo by Muaffaq Hazza.