Figure 7. Graffiti over graffiti over the stairs, 19-10-2015
Figure 4. 3 November, 2015, 110 years later, and 60 years after re plastering of the masonry and bedrock. The bosses of the draughted masonry remain visible as bumps in the thick layer of cement, but the “coping” has been removed. 3-11-2015.
Figure 52. Mayor Hasan Fahed Rgaibeh starting power wash. 14-11-2015.
Figure 61. The north wall of Houses 87 (right) & 88 (left) exposed after the removal of the long-term reservoir cleanout mound from its south side. 10-11-2015. Photo by Muaffaq Hazza.
Figure 13. The soil dried after the water was pumped out in late September. 21-10-2015.
Figure 48. The last bit of sediment disappearing, 10 am, 13-11-2015. The team had chosen to work Friday instead of Saturday, to have their Grand Finale a day early! Photo by Muaffaq Hazza.
Figure 49. Soil is gone! 14-11-2015. Photo by Muaffaq Hazza.
Figure 20. Stone removal part 4; this completed the clearing of sediment basin 2, 19-10-2015.