Figure 61. The north wall of Houses 87 (right) & 88 (left) exposed after the removal of the long-term reservoir cleanout mound from its south side. 10-11-2015. Photo by Muaffaq Hazza.
Figure 15. Nearly a truckload of accumulated trash and garbage was collected before removal of stones and soil began. 19-10-2015.
Figure 64. Payday in the rain shelter of the House XIII great room. Ali Aqil and Bert de Vries distributing the weekly payroll, 5-11-2015. Photo by Muaffaq Hazza
Figure 22. Stone and soil removal – experimental; it proved very difficult to flip the stones over the top edge. 22-10-2015.
Figure 39. Contending with early rain. 7-11-2015.
Figure 26. Stone up 4. 24-10-2015.
Figure 48. The last bit of sediment disappearing, 10 am, 13-11-2015. The team had chosen to work Friday instead of Saturday, to have their Grand Finale a day early! Photo by Muaffaq Hazza.
Figure 30. Taking the high ground first – in a sea of wet sediment. 27-10-2015
Figure 11. Reservoir with residue of rain-supplied water from the winter of 2014-5, 19-9-2015.