Figure 4. 3 November, 2015, 110 years later, and 60 years after re plastering of the masonry and bedrock. The bosses of the draughted masonry remain visible as bumps in the thick layer of cement, but the “coping” has been removed. 3-11-2015.
Figure 22. Stone and soil removal – experimental; it proved very difficult to flip the stones over the top edge. 22-10-2015.
Figure 59. Onto dump small truck. 7-11-2015
Figure 50.Ali Aqil sweeping up, 13-11-2015. Photo by Muaffaq Hazza.
Figure 47. Three days later, the last pocket of soil on the last day of scheduled team work. Photo by Muaffaq Hazza. 13-11-2015
Figure 51. Detol Chlorine and Dish Soap for the power wash solution. 14-11-2015.
Figure 20. Stone removal part 4; this completed the clearing of sediment basin 2, 19-10-2015.
Figure 44. After overnight showers a rain-slicked floor made the work challenging. 9-11-2015.