Figure 5. The energetic crew that completed the R7 excavation. 20 Oct 2017.
Figure 11. Reservoir R19 with soil heaps; looking to southwest. 11 Oct 2016.
Figure 23. The cleaned portion of exposed floor. Proper care of this water source will require periodic cleaning of the entire reservoir floor, at times when the entire water supply is used up. 27 October, 2016.
Figure 4. Reservoir R7 cleaning completed. The Druze-constructed pillars supported the roof. 1 Nov. 2016
Figure 18. The undisturbed sediment area in Reservoir R16. 29 October, 2016.
Figure 9. Reservoir R7 after cleanout, with 20th century plaster intact. 27 October 2016.
Figure 13. Removal of twentieth century reservoir cleanout. 12 Oct. 2016.
Figure 22. Crew members begin cleaning of sediment and algae. 26 October, 2016