Figure 29. Soil removal – bucket by bucket, after the first rain, 26-10-2014
Figure 18. Stone removal part 2. 19-10-2015
Figure 48. The last bit of sediment disappearing, 10 am, 13-11-2015. The team had chosen to work Friday instead of Saturday, to have their Grand Finale a day early! Photo by Muaffaq Hazza.
Figure 9. Supply Channel, NW corner of Umm el-Jimal, 1-2-2012
Figure 46. Left to be done in in the last 4 days, 10-13 November. 9-11-2015.
Figure 13. The soil dried after the water was pumped out in late September. 21-10-2015.
Figure 5. Dedication of USAID funded re-plastering of the reservoir: “Inception of the repair of this reservoir was on 22 December 1954; and completion was on 28 February, 1955. The writer of the line of text was Rakan Ibn Awdah es-Serour.” 10-21-2015.
Figure 33. NE corner 2. Full buckets ‘flew’ up rapidly, and mounds of soil accumulated. 1-11-2015.