Figure 51. Detol Chlorine and Dish Soap for the power wash solution. 14-11-2015.
Figure 60. Sediment from reservoir supplies municipal street side landscaping soil. 8-11-2015
Figure 21. Smaller stones were carried up the steps in a grand 15 minute ‘parade’ in which the 20 members of the Commodus Gate Preservation team participated. 21-10-2015.
Figure 45. Final days: Racing the clock and racing the rain. 9-11-2015
Figure 62. The crew. Ali Aqil, standing far right, was the group’s foreman whose work strategy enabled the completion of the reservoir reconditioning in four weeks. Photo by visitor, 7-11-2015.
Figure 19. Stone removal part 3. 19-10-2015
Figure 36. Each of two teams marked off squares for removal. 4-11-2015
Figure 33. NE corner 2. Full buckets ‘flew’ up rapidly, and mounds of soil accumulated. 1-11-2015.