Figure 64. Payday in the rain shelter of the House XIII great room. Ali Aqil and Bert de Vries distributing the weekly payroll, 5-11-2015. Photo by Muaffaq Hazza
Figure 62. The crew. Ali Aqil, standing far right, was the group’s foreman whose work strategy enabled the completion of the reservoir reconditioning in four weeks. Photo by visitor, 7-11-2015.
Figure 19. Stone removal part 3. 19-10-2015
Figure 41. Another way was to dam up the puddles and move the water away sideways. 8-11-2015.
Figure 64. Muaffaq Hazza, field director, and Ali Owaisi, DoA rep, discussing project strategy. 5-11-2015.
Figure 11. Reservoir with residue of rain-supplied water from the winter of 2014-5, 19-9-2015.
Figure 33. NE corner 2. Full buckets ‘flew’ up rapidly, and mounds of soil accumulated. 1-11-2015.
Figure 10. Roman Reservoir the day after the rains, 2-2-2012.