Figure 5. Dedication of USAID funded re-plastering of the reservoir: “Inception of the repair of this reservoir was on 22 December 1954; and completion was on 28 February, 1955. The writer of the line of text was Rakan Ibn Awdah es-Serour.” 10-21-2015.
Figure 63. Contribution of the Municipality. Mayor Hassan Fahed (right) and Muaffaq Hazza. 7-11-2015
Figure 15. Nearly a truckload of accumulated trash and garbage was collected before removal of stones and soil began. 19-10-2015.
Figure 21. Smaller stones were carried up the steps in a grand 15 minute ‘parade’ in which the 20 members of the Commodus Gate Preservation team participated. 21-10-2015.
Figure 39. Contending with early rain. 7-11-2015.
Figure 18. Stone removal part 2. 19-10-2015
Figure 52. Mayor Hasan Fahed Rgaibeh starting power wash. 14-11-2015.