Figure 40. Pumping the puddles; the main challenge is to keep the water away from the soil. Shown here is a small pump provided by Mayor Hassan Fahed and his municipal staff. 7-11-2015.
Figure 57. Cleaned reservoir with clean water after the first rain, 19-11-2015. Photo by Muaffaq Hazza.
Figure 9. Supply Channel, NW corner of Umm el-Jimal, 1-2-2012
Figure 44. After overnight showers a rain-slicked floor made the work challenging. 9-11-2015.
Figure 5. Dedication of USAID funded re-plastering of the reservoir: “Inception of the repair of this reservoir was on 22 December 1954; and completion was on 28 February, 1955. The writer of the line of text was Rakan Ibn Awdah es-Serour.” 10-21-2015.
Figure 18. Stone removal part 2. 19-10-2015
Figure 33. NE corner 2. Full buckets ‘flew’ up rapidly, and mounds of soil accumulated. 1-11-2015.