Figure 46. Left to be done in in the last 4 days, 10-13 November. 9-11-2015.
Figure 47. Three days later, the last pocket of soil on the last day of scheduled team work. Photo by Muaffaq Hazza. 13-11-2015
Figure 14. The last frog standing, 21-10-2015.
Figure 7. Graffiti over graffiti over the stairs, 19-10-2015
Figure 28. While stones were being removed, another part of the team began removing the soil using buckets and ropes. The strategy was to remove the thinner layers from the edges where bedrock was higher to isolate the deeper and thicker layer in the middle. This and the following 20 photographs show the soil ‘melt’ away until the final remnant is removed from the deeper center. 20-10-2015
Figure 21. Smaller stones were carried up the steps in a grand 15 minute ‘parade’ in which the 20 members of the Commodus Gate Preservation team participated. 21-10-2015.
Figure 22. Stone and soil removal – experimental; it proved very difficult to flip the stones over the top edge. 22-10-2015.
Figure 60. Sediment from reservoir supplies municipal street side landscaping soil. 8-11-2015